Call for RFP/Prospectes

Process Narrative
 




Document Preferences 

Table of Contents

   1.0   Call for RFP/Prospectes
1.1   Start Call for RFP/Prospectes sub-process
1.2   ID Key Participants
1.3   Brainstorm content
1.4   Construct and Publish RFP
1.5   Monitor & stimulate responses
1.6   Collate results & distribute
1.7   Work Request Capture


1.0  
Call for RFP/Prospectes

Call for RFP/Prospectes
Call for RFP/Prospectes

1.1   Start Call for RFP/Prospectes sub-process 

1.2   ID Key Participants 

Where possible this activity should be led and generated by the TM Forum Membership but in the event of resource shortages, TM Forum Staff will assist as appropriate.


1.3   Brainstorm content 

Based upon the input sketch presented, the team need to gather idea's that will enable the construction of a compeling message to the industry which will stimulate the generation of relevant input materail and bring necessary participation to enable the TM Forum to take the next step of standardisation.


1.4   Construct and Publish RFP 

Complete the RFP template as appropriate, review material with sponsors and publish -

(Need to define the template and the mechanism to publish it!  Publish mechanism should be the same as that for Member Survey and must go to the principal contact of all member companies.)


1.5   Monitor & stimulate responses 

Having sent the RFP it is important that the originators ensure that the RFP is understood by the community and the timeframe is adhered to. It is also important that the Member companies who are expected to respond, realise that they have the RFP and are encouraged to respond in time.


1.6   Collate results & distribute 

After the response cut-off time, all responses / proposals are collated and submitted as a set back into the Work Request Capture sub-process.


1.7   Work Request Capture 

Work requests entered via the online form are automatically stored in a central repository. From here it is sanity checked by TM Forum staff and the appropriate Maturity level, (default 1) is set.  It is then assigned and forwarded to a CR Manager who will manage it through the remainder of its life.  

A quick pre-assessment is conducted by the CR Manager to ensure straightforward items can be addressed quickly and more complex ones are sent for more detailed analysis.  Approx 10% of the requests will complete its assessment at this phase of the process.

The duration of this phase should be a 1 to 2 days.

Maturity level for items in this phase would typically be of a level 1 (IPR and other sanity checks having been completed).

Refer to the Work Request sub-process for more details.

Owner

Name Description Type
CCG Admin Role